|
|
|
School system manages roofing assets to keep costs predictable, and to extend roof life cycle as fully as possible.
|
|
|
|
Elementary school re-roofed with standing seam metal for sustainability, aesthetics, low maintenance and improved life cycle cost.
|
|
|
|
Educational campus clay tile roofs were restored, low sloped roofs replaced. Project in excess of $1,000,000 for the Catholic Diocese of Ohio.
|
|
|
|
Interior damage from Tornado. High school gymnasium. RoofTEC provided expertise for owner in negotiating insurance claim relating to wind damage.
|
|
|
|
Tornado damage to roof.
|
|
|
|
New school construction: RoofTEC was involved from earliest planning stages through quality assurance monitoring during construction.
|
|
|
|
|
Kent State University Dormitory roof replacement project: RoofTEC provided quality assurance monitoring for A/E firm.
|
|
|
|
RoofTEC conducts annual maintenance needs survey and infrared moisture detection survey for this high rise office tower on Cleveland's lakefront.
|
|
|
|
Hospital emergency room, new construction: RoofTEC worked with A/E firm as design-consultant for roof, and provided quality assurance monitoring.
|
|
|
|
Colorado office complex: RoofTEC worked as sub to General Contractor for roof design consulting, bid admin. and full time construction monitoring.
|
|
|
|
Mansard roof analysis for condominium complex.
|
|
|
|
Infrared thermogram depicts anomalies at perimeter of roof in yellow. See daytime photo, next.
|
|
|
|
|
Infrared daytime photo shows areas of wet insulation outlined in yellow spraypaint on roof.
|
|
|
|
Insulating concrete installation for improved drainage, r-value, and to provide clean substrate for new roof application.
|
|
|
|
Modified bitumen re-roof project for local municipality.
|
|
|
|
SPUF (sprayed in place urethane foam) provides unique features and benefits in the proper roofing application.
|
|
|
|
Asphalt shingle installation on community center: Quality assurance monitoring and "punch-list" check assured owner of quality installation.
|
|
|
|
Infrared thermogram depicts wet insulation as darker areas.
|
|
|
|
|
Maintenance needs survey for property maintenance management firm included more than 40 sites in 3 states.
|
|
|
|
Condominium roof analysis: Condition evaluation, recommendations and budgets provided to Board for planning.
|
|
|
|
Complex clay tile installation required specialized expertise to work with owner, contractor and A/E firm during installation.
|
|
|
|
IRMA roof (inverted roof membrane assembly)
|
|
|
|
Roof core extraction, to determine construction of roof assembly.
|
|
|